Thorcon believes our 500MW plants can be mass-produced like ships. We envision deployment of 20 GW per year by 2040 and 40 GW per year by 2050. If necessary, any Thorcon plant can be re-floated and relocated. Land-based infrastructure is largely limited to housing for guests (if the plant is remote with no access to nearby hotel accommodations), perimeter security and guard stations, and transmission lines. Each site will also likely require a degree of seabed preparation to receive the plant and possibly a breakwater.